Removing coal residues from settling basin

Serbia

Removing coal residues from settling basin

We are in Kovin, Serbia. In this small city on the Danube, not far from Belgrade, there is a coal settling basin.

Problem

Before adopting the solution proposed by Dragflow, the solid material (carbon residue) accumulated in the tin has always been transferred to the treatment plant by dumper. An expensive and unsustainable procedure.

Solution

Dragflow has managed to propose a more economic and effective solution. One of our hydraulic pumps (model HY50/108) was mounted on the arm of an excavator to collect the compact material sedimented in the basin. This pump can guarantee a transport distance of up to 800 m: the ideal solution to make the use of dumpers superfluous. Another efficient operation performed by our flexible pumps!

Gallery

Related products


Share this page: